IPO Premiums
IPO calendar
SEListed

Sattva Engineering Construction Limited

Bookbuilding IPO · NSE

Price band
₹70 - ₹75
Lot size
1,600 shares
Issue amount
₹35.38 cr
Total subscription
198.25×
Current price₹50.9
Listing price ₹95.1
Watch live price ↗
Opens
26 Aug 2025
Closes
29 Aug 2025
Allotment
1 Sept 2025
Listing
3 Sept 2025

Offer at a glance

Issue overview

Issue size
47,16,800 shares
Face value
0
Minimum investment
₹1,12,000
Fresh issue
₹35.38 cr
Offer for sale
₹0 cr
Registrar
Link Intime India Private Ltd (MUFG)
Listing exchange
NSE
Maximum investment
₹1,20,000
Issue type
Bookbuilding IPO
Shares before issue
1,27,51,816
Shares after issue
1,74,68,616

Lot sizes

CategoryLotsSharesAmount
RETAIL23,200₹2,40,000
sHNI34,800₹3,60,000
bHNI914,400₹10,80,000

Share reservation

Anchor28.19%
QIB18.83%
HNI14.65%
RETAIL33.24%
Market Maker5.09%

Subscription & GMP

Subscription by category

Total subscribed198.25×

Missing multiples are calculated from bids and offered shares when available.

QIB123.39×
NIB351.94×
HNIs(10L +)407.94×
HNIs (2-10L)239.95×
RETAIL172.89×

GMP history

0132620 Aug: ₹022 Aug: ₹1525 Aug: ₹1726 Aug: ₹1928 Aug: ₹1929 Aug: ₹2030 Aug: ₹2531 Aug: ₹262 Sept: ₹203 Sept: ₹245 Nov: ₹2421 Nov: ₹24
20 Aug₹2421 Nov

Application-wise demand

CategoryReserved applicationsApplied applications
QIB088
NIB022,964
RETAIL49084,717
HNIs(10L +)9612,363
HNIs (2-10L)4810,601

Subscription demand

Amounts in ₹ crore. HNI subcategories are included in the NII total.

CategoryOfferedDemand
QIBs6.66821.77
FIIs0282.53
FIs036.48
Others0502.76
RETAIL11.762,033.21
HNIs 2+1.73414.64
HNIs 10+3.461,409.83

Financial performance

Company financials

In Crores · Reported periods may include interim results.

Revenue & profitIn Crores
050100Mar-23 · Revenue: 83.93Mar-23 · Profit after tax: 1.04Mar-23Mar-24 · Revenue: 77.44Mar-24 · Profit after tax: 4.56Mar-24Mar-25 · Revenue: 94.85Mar-25 · Profit after tax: 9.14Mar-25
RevenueProfit after tax

Key performance indicators

MetricMar-25Mar-24Mar-23
EPS7.644.150.94
ROE27.120.985.48
ROCE28.5822.1414.08
RONW000
PRE IPO(PE)10.4600
POST IPO(PE)14.3400

Values and labels as reported in the issue data.

Peer comparison

CompanyP/E(X)CMP* (₹)Face value (₹)NAV/Share (₹)RONW(%)EPS (Basic) (₹)
Sattva Engineering & Construction LimitedNANA1034.0527.107.64
EMS Limited18.23602.410175.720.6633.05
Enviro Infra Engineers Limited21.5252.891056.6627.5811.76
VA Tech Wabag Limited33.41585.710284.814.8647.48

Company information

Company profile

Sattva Engineering Construction Limited (SECL), incorporated in December 2005 and based in Chennai, is an EPC company with over 40 years of experience in water infrastructure, wastewater management, and industrial construction. Recognized as a leading Class I contractor, it works closely with government bodies such as the Tamil Nadu PWD and CMWSSB. SECL provides end-to-end EPC solutions across water and wastewater projects, industrial and civil infrastructure, and residential developments, including treatment plants, pumping stations, warehouses, factory buildings, and multi-storeyed apartments. Its notable clients include CMWSSB, TWAD, PWD, Greater Chennai Corporation, Southern Railway, and BHEL.

Strengths

  • Strong In-House Expertise: experienced design, engineering, and execution team ensures timely, cost-effective, and quality project delivery
  • Advanced Tech Adoption: continuous upgrades in STP & WTP construction for efficiency, compliance, and high standards
  • Reputed Funding Support: projects backed by World Bank, ADB, and government schemes ensure stability, timely payments, and lower risk

Risk factors

  • Government Project Reliance: heavy dependence on schemes like AMRUT and JJM, budget cuts may reduce project flow
  • High Working Capital Needs: cash-intensive operations, limited financing or cash flow issues can affect liquidity and stability
  • Cost Estimation Risk: inaccurate bidding estimates may lower profitability and reduce returns

Promoters

Santhanam Seshadri

R Sekar

Jagachchandarr Sekar Uthra

Registrar & documents

Lead manager

Vivro Financial Services Private Limited

Registered office

Greams Dugar, 4th floor, North Wing, Old No. 149, New No . 64, Greams Road Thousand Lights Chennai, Tamil Nadu, 600006

+91-80 1555 6979

[email protected]Company website ↗

Frequently Asked Questions

What is Sattva Engineering Construction IPO GMP today?

As of today, Sattva Engineering Construction IPO Grey Market Premium (GMP) is reported at +₹24 per share. Based on the upper price band of ₹75, the estimated listing price is ₹99 (+32.0% expected listing gain). Please note that GMP is an unofficial market estimate for sentiment tracking and does not guarantee the actual listing price.

What is the lot size and minimum investment for Sattva Engineering Construction IPO?

The minimum bid lot size for Sattva Engineering Construction IPO is 1,600 shares. At the cut-off price of ₹75 per share, retail investors need a minimum application amount of ₹1,20,000 per lot. Retail applicants can apply for a maximum of 1 lots (up to ₹2,00,000).

When will Sattva Engineering Construction IPO allotment status be announced?

The allotment status for Sattva Engineering Construction IPO is scheduled to be finalized on 1 Sept 2025. If you applied for the IPO, you can verify whether shares have been allocated to your Demat account through Link Intime India Private Ltd (MUFG)'s official portal or via BSE/NSE allotment portals.

How can I check Sattva Engineering Construction IPO allotment status online by PAN?

To check Sattva Engineering Construction IPO allotment status: 1) Visit the registrar portal (Link Intime India Private Ltd (MUFG)) or the BSE IPO allotment page. 2) Select 'Sattva Engineering Construction Limited' from the company dropdown. 3) Choose 'PAN' as your identification mode and enter your 10-digit Permanent Account Number. 4) Click 'Search' to view your allotted share quantity and application status.

Explore More IPO Analysis & Live Tools

Compare the price band and required investment with company financials and official offer documents. Grey market premium (GMP) figures are indicative market estimates collected from primary market brokers and do not establish the official listing price.

Regulatory Disclaimer: Grey Market Premium (GMP) is an unofficial, unregulated indicator of market sentiment and does not represent a stock exchange transaction, guarantee, or investment advice. IPO Premiums is an informational and research portal and is not a SEBI-registered investment advisor. Please consult a qualified financial advisor before applying for any IPO.
Sattva Engineering Construction IPO GMP Today, Subscription Status & Allotment Date | IPO Premiums